Difference between revisions of "The Kingston Building"
Jump to navigation
Jump to search
Tag: visualeditor-wikitext |
|||
(19 intermediate revisions by the same user not shown) | |||
Line 21: | Line 21: | ||
==Description== | ==Description== | ||
Located in the Bargain Basement district of Redmond, The Kingston Building was purchased by MERC on July 31st of 2082. The project is currently [[The Kingston Building#Donation_History|accepting donations]] to rebuild; these donations will provide a clean, safe environment for local citizens. | |||
{| class="mw-collapsible mw-collapsed wikitable" | {| class="mw-collapsible mw-collapsed wikitable" | ||
! colspan= | ! colspan=2 style="width: 812px;" | Blueprints and floor descriptions | ||
|- | |- | ||
! Description | ! Description | ||
! Blueprint | ! Blueprint | ||
|- | |- | ||
! Floors 2-5 | ! style="width: 400px;" | Floor 1 | ||
| rowspan=2 | [[File:Kingston_Building_(floor_1).png|400px]] | |||
|- | |||
| This floor will be rented to businesses and organizations that provide meaningful services to the community. | |||
|- | |||
! style="width: 400px;" | Floors 2-5 | |||
| rowspan=2 | [[File:KB2+.png|400px]] | | rowspan=2 | [[File:KB2+.png|400px]] | ||
|- | |- | ||
Line 40: | Line 45: | ||
==Distinctive Features== | ==Distinctive Features== | ||
====Floor 1==== | |||
The Kingston Building will house 6 businesses on the first floor, including [[MERC]]'s headquarters in the smallest space. Currently, no spaces are in acceptable condition to facilitate public spaces. | |||
====Floor B1==== | |||
A parking garage | |||
==IC Information== | ==IC Information== | ||
===Notable Associated Characters=== | ===Notable Associated Characters=== | ||
Line 65: | Line 75: | ||
==Donation History== | ==Donation History== | ||
The building was purchased by the Metroplex Equal Rights Coalition; this purchase was spearheaded by [[Relay]], who collected 100k in donations from shadow associates and added 250k from his own pocket. | The building was purchased by the [[MERC|Metroplex Equal Rights Coalition]]; this purchase was spearheaded by [[Relay]], who collected 100k in donations from shadow associates and added 250k from his own pocket. | ||
Additional, unapplied donations thus far: | |||
* Wires (8k) | |||
* Zenith (5k) | |||
* Koschei (6k) | |||
{| class="wikitable" | {| class="wikitable" | ||
Line 75: | Line 90: | ||
|- | |- | ||
!Electricity Repair | !Electricity Repair | ||
| | |[[Six of Hearts]] | ||
| | |[[Mara]] | ||
| | |[[Babylon]] | ||
| | |[[Delphi]] | ||
| | |[[Ibis]] | ||
|- | |- | ||
!Water & Sewer | !Water & Sewer | ||
|= | |colspan="5"|[[Samsara]] | ||
| | |||
|- | |- | ||
!Building Maintenance | !Building Maintenance | ||
|= | |colspan="2"|[[Vip3r]] | ||
| | |[[Artemisia]] | ||
| | |[[Ca1yps0]] | ||
| | |[[Cold Hands]] | ||
| | |||
|- | |- | ||
!Elevator 1 Repair | !Elevator 1 Repair | ||
|= | |colspan="5"|[[Draco Foundation]] | ||
| | |||
|- | |- | ||
!Elevator 2 Repair | !Elevator 2 Repair | ||
|= | |colspan="5"|[[Draco Foundation]] | ||
| | |||
|} | |} | ||
Line 250: | Line 252: | ||
!rowspan = "2"|Low | !rowspan = "2"|Low | ||
!Wiring | !Wiring | ||
| | |[[Ibis]] | ||
!colspan = "3"| | !colspan = "3"| | ||
|- | |- | ||
!Plumbing | !Plumbing | ||
| | |[[Ibis]] | ||
!colspan = "3"| | !colspan = "3"| | ||
|- | |- | ||
Line 279: | Line 281: | ||
!rowspan = "2"|Low | !rowspan = "2"|Low | ||
!Wiring | !Wiring | ||
| | |[[Setback]] | ||
!colspan = "3"| | !colspan = "3"| | ||
|- | |- | ||
!Plumbing | !Plumbing | ||
| | |[[Babylon]] | ||
!colspan = "3"| | !colspan = "3"| | ||
|- | |- | ||
Line 308: | Line 310: | ||
!rowspan = "2"|Low | !rowspan = "2"|Low | ||
!Wiring | !Wiring | ||
| | |[[Babylon]] | ||
!colspan = "3"| | !colspan = "3"| | ||
|- | |- | ||
!Plumbing | !Plumbing | ||
| | |[[Babylon]] | ||
!colspan = "3"| | !colspan = "3"| | ||
|- | |- | ||
Line 337: | Line 339: | ||
!rowspan = "2"|Low | !rowspan = "2"|Low | ||
!Wiring | !Wiring | ||
| | |[[Delphi]] | ||
!colspan = "3"| | !colspan = "3"| | ||
|- | |- | ||
!Plumbing | !Plumbing | ||
| | |[[Delphi]] | ||
!colspan = "3"| | !colspan = "3"| | ||
|- | |- | ||
Line 366: | Line 368: | ||
!rowspan = "2"|Low | !rowspan = "2"|Low | ||
!Wiring | !Wiring | ||
| | |[[Ibis]] | ||
!colspan = "3"| | !colspan = "3"| | ||
|- | |- | ||
!Plumbing | !Plumbing | ||
| | |[[Babylon]] | ||
!colspan = "3"| | !colspan = "3"| | ||
|- | |- |
Latest revision as of 12:27, 8 October 2021
Location Creator | SilasBane |
---|---|
Archetype | Medium Apartment Building |
IC Owner | Relay |
Metroplex | Seattle |
Neighborhood | Bargain Basement |
Background Count | 2 |
Noise | 3 |
Faction | MERC |
Description
Located in the Bargain Basement district of Redmond, The Kingston Building was purchased by MERC on July 31st of 2082. The project is currently accepting donations to rebuild; these donations will provide a clean, safe environment for local citizens.
Distinctive Features
Floor 1
The Kingston Building will house 6 businesses on the first floor, including MERC's headquarters in the smallest space. Currently, no spaces are in acceptable condition to facilitate public spaces.
Floor B1
A parking garage
IC Information
Notable Associated Characters
Matrix Search Table
Threshold | Result |
---|---|
1 | |
3 | |
6 |
Area Knowledge:Seattle Table
Threshold | Result |
---|---|
1 | |
3 | |
5 |
Runs Featuring This Location
Name | GM | Metaplot | Date of Run |
---|---|---|---|
Skin in the Game | Sarcarian | 21 July 2082 |
Donation History
The building was purchased by the Metroplex Equal Rights Coalition; this purchase was spearheaded by Relay, who collected 100k in donations from shadow associates and added 250k from his own pocket.
Additional, unapplied donations thus far:
- Wires (8k)
- Zenith (5k)
- Koschei (6k)
Rebuilding | |||||
---|---|---|---|---|---|
Upgrade Name | Donors | ||||
Electricity Repair | Six of Hearts | Mara | Babylon | Delphi | Ibis |
Water & Sewer | Samsara | ||||
Building Maintenance | Vip3r | Artemisia | Ca1yps0 | Cold Hands | |
Elevator 1 Repair | Draco Foundation | ||||
Elevator 2 Repair | Draco Foundation |
Ground Floor Commercial Units | ||||||
---|---|---|---|---|---|---|
Unit | Upgrade Name | Donors | ||||
11 | Wiring | =10k WftP Donation= | =10k WftP Donation= | |||
Plumbing | =10k WftP Donation= | =10k WftP Donation= | ||||
Conversion | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |
12 | Wiring | =10k WftP Donation= | =10k WftP Donation= | |||
Plumbing | =10k WftP Donation= | =10k WftP Donation= | ||||
Conversion | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |
13 | Wiring | =10k WftP Donation= | =10k WftP Donation= | |||
Plumbing | =10k WftP Donation= | =10k WftP Donation= | ||||
Conversion | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |
14 | Wiring | =10k WftP Donation= | =10k WftP Donation= | |||
Plumbing | =10k WftP Donation= | =10k WftP Donation= | ||||
Conversion | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |
15 | Wiring | =10k WftP Donation= | =10k WftP Donation= | |||
Plumbing | =10k WftP Donation= | =10k WftP Donation= | ||||
Conversion | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |
16 | Wiring | =10k WftP Donation= | =10k WftP Donation= | |||
Plumbing | =10k WftP Donation= | =10k WftP Donation= | ||||
Conversion | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= |
Second Floor Units | |||||||
---|---|---|---|---|---|---|---|
Unit | Upgrade Name | Donors | |||||
21 | Low | Wiring | Ibis | ||||
Plumbing | Ibis | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= | |||||
22 | Low | Wiring | Setback | ||||
Plumbing | Babylon | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= | |||||
23 | Low | Wiring | Babylon | ||||
Plumbing | Babylon | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= | |||||
24 | Low | Wiring | Delphi | ||||
Plumbing | Delphi | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= | |||||
25 | Low | Wiring | Ibis | ||||
Plumbing | Babylon | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= | |||||
26 | Low | Wiring | =10k WftP Donation= | ||||
Plumbing | =10k WftP Donation= | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= |
Third Floor Units | |||||||
---|---|---|---|---|---|---|---|
Unit | Upgrade Name | Donors | |||||
31 | Low | Wiring | =10k WftP Donation= | ||||
Plumbing | =10k WftP Donation= | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= | |||||
32 | Low | Wiring | =10k WftP Donation= | ||||
Plumbing | =10k WftP Donation= | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= | |||||
33 | Low | Wiring | =10k WftP Donation= | ||||
Plumbing | =10k WftP Donation= | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= | |||||
34 | Low | Wiring | =10k WftP Donation= | ||||
Plumbing | =10k WftP Donation= | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= | |||||
35 | Low | Wiring | =10k WftP Donation= | ||||
Plumbing | =10k WftP Donation= | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= | |||||
36 | Low | Wiring | =10k WftP Donation= | ||||
Plumbing | =10k WftP Donation= | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= |
Fourth Floor Units | |||||||
---|---|---|---|---|---|---|---|
Unit | Upgrade Name | Donors | |||||
41 | Low | Wiring | =10k WftP Donation= | ||||
Plumbing | =10k WftP Donation= | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= | |||||
42 | Low | Wiring | =10k WftP Donation= | ||||
Plumbing | =10k WftP Donation= | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= | |||||
43 | Low | Wiring | =10k WftP Donation= | ||||
Plumbing | =10k WftP Donation= | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= | |||||
44 | Low | Wiring | =10k WftP Donation= | ||||
Plumbing | =10k WftP Donation= | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= | |||||
45 | Low | Wiring | =10k WftP Donation= | ||||
Plumbing | =10k WftP Donation= | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= | |||||
46 | Low | Wiring | =10k WftP Donation= | ||||
Plumbing | =10k WftP Donation= | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= |
Fifth Floor Units | |||||||
---|---|---|---|---|---|---|---|
Unit | Upgrade Name | Donors | |||||
51 | Low | Wiring | =10k WftP Donation= | ||||
Plumbing | =10k WftP Donation= | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= | |||||
52 | Low | Wiring | =10k WftP Donation= | ||||
Plumbing | =10k WftP Donation= | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= | |||||
53 | Low | Wiring | =10k WftP Donation= | ||||
Plumbing | =10k WftP Donation= | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= | |||||
54 | Low | Wiring | =10k WftP Donation= | ||||
Plumbing | =10k WftP Donation= | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= | |||||
55 | Low | Wiring | =10k WftP Donation= | ||||
Plumbing | =10k WftP Donation= | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= | |||||
56 | Low | Wiring | =10k WftP Donation= | ||||
Plumbing | =10k WftP Donation= | ||||||
Med | General Contracting | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
High | Kitchen Remodel | =10k WftP Donation= | =10k WftP Donation= | =10k WftP Donation= | |||
Bathroom Remodel | =10k WftP Donation= | =10k WftP Donation= |